031035 Amtrak Carolinian passing
track construction site near Durham, N.C.

Ernest H. Robl stock photos: Railroad track construction and maintenance

Additional caption information for the photo at left is available with the larger version of the image. To display that image,click on the image.

All of these images are from track projects on the North Carolina Railroad (state owned but operated by Norfolk Southern) in North Carolina in 2003.

Railroad construction continues to take place, though often out of sight from the general public. My stock photo coverage of railroad construction and maintenance ranges from modern main lines of major freight railroads to work on new rail transit systems, including urban light rail.

The images here a only a small sampling of a wide range of construction photos from many parts of the U.S. (and Europe). If you need images or activities or equipment not shown here, please contact me for information on what else may be available.

Click on any of the images for a larger version, usually with a more extended caption.

Track machines


031021 Ballast tamper at work

031019 Ballast regulator at work

Tampers and ballast regulators are two of the most important machines for assuring correct track alignment. Information about the operation of these machines is provided in the captions of the larger versions of these images.

Other construction machines


031011 Bulldozer climbing over track

030202 Crossing rebuild

Tracked and wheeled equipment also plays an important part in railroad construction and maintenance. When operated carefully, even bulldozers can climb over track without doing damage.

Tie placement


031049

031044

030159

Though many aspects of track construction can be highly automated, laying of new track with machinery is normally only done for the largest projects. Here workers manually place and space ties for new mainline track at Funston, just west of Durham, N.C.

New rail waiting to be fully spiked


030959

030958

030969
 

Manually built track still requires manual placement of spikes. These spikes will be driven into the ties by a mechanized spike driver.

Track hardware (recovered from dismantled old track)


030974 Rail anchors

030978 Spikes

031004 Tie plates

040578 used rail sections
Recovered rail from track construction project. These rails had been used on a section of main line track that has been rebuilt with newer and heavier rail. Though showing some wear, these rails still have a useful life on sidings and industrial spurs where trains travel only at low speeds or which are used primarily for storing railcars.

Dumping ballast


030871 Hi-rail dump truck with swivel bed

031081 Dumping ballast from ballast train
 

Details


031001 Rail tongs

031054 Tie claw on
backhoe
   

For photos of the replacement of a century-old railroad bridge at Clayton, N.C., click here.

Additional track images are included on my Generic / technical railroad stock photos page.


For access to many additional categories of railroad images, please go to my Pictures by category page.


[Business] [Transportation data & commentary] [Stock photo newsletters]
[Ernest H. Robl Home Page] [Feedback / e-mail]
[Pictures by category]

All content of this site is protected by copyright. None of the content of this site may be used for any purpose without specific written permission and the payment of applicable fees.

PLEASE READ THIS: I am a photographer and writer specializing in transportation and travel subjects. I am not involved in the transportation business myself, nor do I deal in any types of transportation equipment or services. Therefore, I cannot tell you where to buy, lease, or sell transportation equipment or supplies, nor how to ship specific goods between specific points. The photos of transportation equipment and supplies on this site are provided solely as samples of the types of images available from me as journalist.